Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-09-26-10046 RYOBI FOUNDATION PRE -MANUFACTURED ADU 13114 HWY 82, CARBONDALE RYOBI FOUNDATION PROPERTY SUB, PARCEL 5 MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (C.D.O.H.) AND ALL FACTORY -BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. (2018 IECC'BLOWER DOOR TESTING' ON PREMISES AFTER INSTALLATION SHALL NOT APPLY FOR HUD HOMES BUT DO APPLY FOR IRC/IBC MANUFACTURED HOMES 1) FOUNDATION CRAWL SPACE & EXTERIOR DOOR LANDING / STAIRS SHALL COMPLY WITH 2O15 I.R.C., 2018 I.E.C.C. AND MANUFACTURER'S INSTALLATION REQUIREMENTS. 2) NOTE: GARFIELD COUNTY REQUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 3) WHILE NOT REQUIRED FOR YOUR HOME BECAUSE IT IS OUTSIDE THE MAPPED WILDFIRE HAZARD ZONES. IT IS HIGHLY RECOMMENDED TO FOLLOW THE CWRC GUIDELINES. PLEASE REFER TO THE WILDFIRE RESILIENCY CODE HANDOUT ATTACHED TO THE PLANS FOR MORE INFO. 4) GEOTECHNICAL OBSERVATION IS REQUIRED WHEN THE EXCAVATION IS COMPLETE AND WRITTEN VERIFICATION BE SUPPLIED AT FOOTING INSPECTION, 1500PSF. 5) THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS. 6) SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS. 7) A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT AND APPROVE THE ELECTRICAL WORK. HTTPS://WWW.COLORADO.GOV/PACIFIC/DORA/DPO ELECTRICAL PLUMBING PE RMITS 8) UNDERGROUND UTILITY LOCATES IS THE RESPONSIBILITY OF THE OWNER OR CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE. 9) DRAINAGE ACROSS PROPERTY LINES SHALL NOT EXCEED THAT WHICH EXISTED PRIOR TO GRADING. EXCESS OR CONCENTRATED DRAINAGE SHALL BE CONTAINED ON SITE OR DIRECTED TO AN APPROVED DRAINAGE FACILITY. EROSION OF THE GROUND IN THE AREA OF DISCHARGE SHALL BE PREVENTED BY INSTALLATION OF NON -EROSIVE DOWN DRAINS OR OTHER DEVICES. 10) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTIONS. 11)ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED. 12) LIFER GROUNDS ARE REQUIRED TO BE INSPECTED AT FOOTING INSPECTION 13) INSTALL STORMWATER CONTROLS PRIOR TO ANY DIRT WORK. 14) CONTROL NOXIOUS WEEDS. TREAT EXISTING WEEDS PRIOR TO RELOCATING PLANTS AND SEEDS. 15) REVEGITATE ALL DISTURBED AREAS THAT ARE NOT PART OF A ROAD OR NON - SEEDED AREA. 16) PROVIDE EROSION CONTROLS UNTIL SEEDED AREAS CAN BE ESTABLISHED. 17) PROVIDE DUST CONTROL AS REQUIRED DURING CONSTRUCTION. 18) FOLLOW ENGINEERED PLANS. VERIFY ANY CHANGES WITH THE ENGINEER.