HomeMy WebLinkAbout1527 1527
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
2014 Blake Avenue
F, Glenwood Springs, Colorado 81601
! Phone (303) 945-8241
}
Job Address figh'tey 6 & - Now Castle - 3'; miles W. of New Castle
Nature of Work _ bui (dint! Permit
Use of Building.
Nobi 1 e Home
t Owner Mii'hnt -1 Wayne Nolan
Contractor
Amount of Permit: $ «' • (I ' I D ate: September 15. 19E :0
Toni L. Sherwood
CLERK
tL
ar
Building Permit Application
' N? 1344
arfield County, Colo. 9 /r 5/$ G 19
Owner: _LJ
Contractor or Builder: OLt.We't
V
Location: _m l(es WPS) csF ,uew G si& HH 4 64 a4
Purpose for which building is to be used: 12e le•h1C2 ,_ \ ut1 E - NtOM(1
Size of Lot: _ _ _L _24 3 Cie es
`' Distance of building from property line at:
Front 6`,:d)0 F+' -- Rear a OO Ff
Left side 9 r _>? iI'- __.. Right side 9% - {•
Distance from nearest building: ? Go H • Number of stories: - I
Source of water supply: Wel( Number of rooms:
Type of sewage disposal: SPpikC- Type of foundation: SONIC k'(' , `' 1„ V S JJ
Width of Building: ac) � Material in outside walls: A f -.
Length of Building: (-') (1 Exterior Finish: /22? A 110)4
Height of walls: — `Z Type of roof: Sheol -
rl r
Floor space in sq. ft.: 4
Y,. - 1 3 SOO
Estimated Cost: $ -
Date construction will start: I /ISMU Date of completion: 10JI /Zf0
L.
Permit Charge: $ __ per 1st $1,000 Valuation.
$ __ _ per each additional $1,000 Valuation.
TOTAL $ - 2 7 e eD
And I /We hereby agree to build strictly to the terms of the above description, and also to clear the
grounds adjacent street or streets of all rubbish and debris caused by the construction of said building.
e' 7/
Respectfully, /7/ Net- c a ,
P4
The County Commissioners hereby grant the above permit as per terms therein stated. This /6
day of — _-x ,7 Y — — . 191
"
- - 771--( -Tel,-,?'
Building Inspector
Clerk
.v;__
GARFIELD COUNTY ✓ ' /
• STATE OF Colorado V
ti, ()like of Building Official
REQUEST FOR INSPECTION Isar/
Date Time T. I . Permit No.
Received L s P.M. District No.
�� A4 le 4 a4-- 3 Y,.mI .w w d
.ct,m - Coa
e - •D Address ocallty
• ` Name 'L • I•'- • • r contractor •
Foundation PLASTERING ELECTRICAL PLUMBING HEATING
F ❑ Wire ❑ Rough Wiring .0 Rough ❑ Rough ❑
Chimney ❑ Lath ❑ Finish Wirng..❑ Final ❑ Final ❑
Framing ❑ Scratch... ........ ...0 Fixtures ❑ Sewers ❑ Water R .. ❑
Final ❑ Brown ❑ Motors ❑ Gas ❑
VAIN ✓Finish ❑ Cesspool ❑
tl Wallboard ❑ `
READY FOR INSPECTION 1 ••'O t;411444
•,?.T. Tues. ed Thurs. \ Fri.
Inspection Made / S 7 `'' A ' : � +�
lnspccror _— ".
••,. od 1 _._ _ __