HomeMy WebLinkAbout1538 1
at
f } 5.38
__ . CC J
J
_ GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
LT
2014 Blake Avenue
_ Glenwood Springs, Colorado 81601
- Phone (303) 9454241
Job Address Logan Wash - De13e9" _ Colorado
= Nature of Work bu'i 1dinti Permit
Use of Building. 3o11 Cr house
owner Occidental Oil Shale
Contractor C. b, W. Builders, Inc.
Amount of Permit: $ 355 Date: September 29. 1980
Toni L. Sherwood
E CLERK
E .
RECEIVED SEP 2 4 1930
Building Permit Application
Ne 1460
Garfield County, Colo. September 22 1980 •
Owner: Occidental Oil Shale
Contractor or Builder: C.B.R. . PIITM HERS, 7NC.
Location: Logan Wash, Debeque, Colorado
Purpose for which building is to be used: Boiler House
Size of Lot: —
Distance of building from property line at:
Front _ Rear
Left side _____ -_ -_- Right side
Distance from nearest building: 200' + Number of stories:
Source of water supply: Number of rooms: - --
Type of sewage disposal: Type of foundation:
Width of Building: __ 40 Material in outside walls:
Length of Building: 150 Exterior Finish:
Height of walls: — 20 Type of roof: —
Floor space in sq. ft.:— 6,000
Estimated Cost: $ — - 75,000
Date construction will start: 10 -6 -80 Date of completion: _ 11 -1 -80
Permit Charge: $ 13 7 or per 1st $1,000 Valuation.
gootet q?cv $ _L!. Co per each additional $1,000 Valuation.
TOTAL $ - : -=' ('
And I /We hereby agree to build strictly to the terms of the above description, and also to clear the
grounds adjacent street or streets of all rubbish and debris caus•d by the construction of said buildin
Respectfully, 1 /-
in:. D. Chamber ain
This application is for the building structure on y. Concrete & interior work is not by
C.B.W. Builders, Inc.
The County Commissioners hereby grant the above permit as per terms therein stated. This 2 �7
day of -- , 19k
Building Inspector
Clerk
r ,s +, ` GARFIELD COUNTY J. r) i , , (✓ „� \
('N '
3 ” -STA O F Col orado r
I � �, jt Y' Office of Building Official
R EQUEST FOR INSPECTION �j�
•. T Dater /.2 7 /err Permit No. /6" r�i Ji
R // p �j M7 District No.
/'0(v� L {, / ��� • Or 1t f p 'r
6. Job Address Locality
Owner:- i / -7 Contractor
Name 11
BUILDING PLASTERING ELECTRICAL PLUMBING HEATING
Foundation ❑ Wire ❑ Rough Wiring .0 Rough ❑ Rough
Chimney ❑ Lath ❑ Finish Wiring .. Flnat ❑ Final
Framing Scratch ❑ Fixtures ❑ Sewers ❑ Water Hester.. ❑
i
Plnat Brown ❑ Motors. ❑ Gas ❑
Finish ❑ Cesspool ❑
Wallboard ❑
READY FOR INSPECTION �.@ .�?�
M Tues. Wed. CEP
Fri• s'�'t.—
Inspection Mede � t � j �� i �/ ��' 2
s Inspector ,G ' �'. ,7, <• •
[foam 300.1 _