HomeMy WebLinkAbout1348 k Building Permit Application
= we 629
Carrell C ounty, Colo. /— /S_ , 19 je.7
Owner: ei4 w .
t
- -q4 . 1 �. = •�
Contractor or Builder: i
Location: 0/ ' ,
Purpose for which building is to be used: rq
- Size of Lot:. ,/./_0____X_____
Distance of building from property line at:
Front 0 Rear
Left side _SO Right side /�
r
/
a t ' Distance from nearest building:/c Number of stories:
Source of water supply: iv O c_ Number of rooms: _ /
ri Type of sewage disposal: We N "e Type of foundation: — C
Width of Building: _ ay / Material in outside walls: F -7- / frn e
;-. Length of Building: ^ r�0 Exterior Finish: ���// C2 /de w
Height of walls: , � o Type of roof:
Floor space in sq. ft.:— 0 0
Estimated Cost: $ � ^ ��
Date construction will start: / — c - ' Date of completion: _ v 2 - / S- 8' 0
'a Permit Charge: $ __ per 1st $1,000 Valuation.
r
." $__ per each additional $1,000 Valuation.
•i, TOTAL $ _ D ce
And I /We hereby agree to build strictly to the terms of the above description, and also to clear the
k- grounds adjacent street or streets of all rubbish and debris caused by the construction of said building.
At
_ _
Respectfully, 44/ - ��—
r:
The County Commissioners hereby grant the above permit as per terms therein stated. This l s ----
day of ofe-kt -_ , 1972'.
Building Inspector
Clerk
- POST THIS CARD AT OR NEAR FRONT OF BUILDING ". t$4$
Phone No. GARFIELD COUNTY Address
945 41 /� BUILDING DEP 1 T 201 aka Ave
Y 111 o
s ' No 1348
Job Address 0 -5 at rn reet Type Occupancy
Nature of Work Ouildinn Permi
Use of Building Garage
Owner Charles E. Mattingly'
Contractor Owner '
Amount of Permit $ 20.00 Date January 15, 1980
Toni L, Sherwood
Clerk
NOTE: ALL CHECKS MUST BE MADE PAYABLE TO GARFIELD CO. CLERK & RECORDER
"
Inspector must sign all
.. _ P g spaces pertaining to this Job
INSPECTION DATE INSPECTOR
Foundations:
Setback
Trench
i Reinforcing
Foundation Wall and
Weather Proofing
Pour no concrete until above has been signed •
Concrete Slab Floor
Electrical (Groundwork) + R
Plumbing (Groundwork)
Gas Piping (Groundwork) t'
Do ndt pour floor until above has been signed
-- - Rough Electrical
Rough Plumbing •
Rough Gas Piping
Rough Heating and Ventilation_
(Above must be signed prior to
framing inspection)
Framing
Cover no work until above has been signed
Lath and Plaster (Interior)
Lath
Scratch Coat •
Brown Coat
Finish Coat
Wallboard
Lath and Plaster (Exterior) .
Lath
i
Scratch Coat
Brown Coat
Finish Coat
Miscellaneous
•
Roofing
Sewer
Refrigeration
Electrical Underground
Final
• Electrical Fixtures
Plumbing Fixtures
Gas Piping
—'� Heating and Ventilation
.:.
Job Completed