HomeMy WebLinkAbout1344 1 1344
Phone No. GARFIELD COUNTY Address
945 -8241 BUILDING DEPARTMENT 2014 Blake Ave
rry
Job Address NXII 0393 Rippy Lane Type Occtpuyy
Nature of Work Building Permit
Use of Building Residence Remodel
Owner Glen A. Haff
Contractor Owner
Amount of Permit $ 52.00 Date December 26. 1979
Toni 48 k i rherwnod
.
Building Permit Application
N? 1143
Garfield l � County � Colo. R-c a 6, , 1979.
�
Owner: /j�. � Y/ - Ye
Contractor or Builder: /0-
Location: (,_s 7 3 - its--
Purpose for which building is to be used: e--n•9 t',P
Size of Lot: _ 2_ 7 --o
Distance of building from property line at: _
Front LS Y_LS - Rear _ .-) c / "r
Left side _ -? c I_ _r Right side 2,0 0 1- T
•
Distance from nearest building: .2 2 0 /�t Number of stories: _ 7
Source of water supply: ` e--(ti Number of rooms: _ R
Type of sewage disposal: 41.c -e_ - /'-/e Type of foundation: _ Co--2,, ,0_ -
Width of Building: — __S l J 1 r Material in outside walls: 63.ntri 1- 1 -✓L'a
Length of Building: g: /_) G if Exterior Finish: // ✓r -��J__
Height of walls: ____ 6 it Type of roof: -t'4 -2/ -04-Tic A
Floor space in sq. ft.: J Li f ' --
Estimated Cost: $ - -- 1a• 6 6 Date construction will start:___ _�� - 2 d /`97 %Date of completion: Jr., J n 1 7(1
Permit Charge: $ per 1st $1,000 Valuation.
$ per each additional $1,000 Valuation.
TOTAL $ - _ -,1 ,_°_.
And I /We hereby agree to build strictly to the terms of the above description, and also to clear the
grounds adjacent street or streets of all rubbish and debris caused by the construction of said building,
Respectfully, 1 i� 1 •Eii/
The County Commissioners hereby grant the above permit as per terms therein stated. This 2 L,
day of 1__ -- __ , 1977.
Building Inspector
Clerk
GARFIELD COUNTY
— _ Wise Ca Mai.. JI1 •
STATE OF C O
__. 1 orad0 "40
Office of Building Official
REQUEST FOR INSPECTION 1 3 1 Dat@ ✓ J .` ? —_— - Permit No. 1 3 4
Time
t1
Received_ _ _ -- District No.__
eN3 - - --_ - -
pppp �,�, J dor s - - _ ,.- Locality
t Owner'
Name _Contractor
` 111M l - PLAST I ELECTRICAL PLUh7RIN ,.t HEATING
f. Foundation ❑ Wire ❑ Rough Wiring .0 Rough - IS Rough ❑
Chimney ❑ Lath ❑ Finish Wiring..❑ F inal ❑ Final ❑
{
Framing S - Scratch ❑ Fixtures ❑ Sewers ❑ Water Heater.. ❑
F
Final ❑ Brown ❑ Motors. ❑ Gas ❑
Finish ❑ Cesspool ❑
4. s Wallboard ❑
READY FOR INSPECTION A.M.
i , .. Tues. Wed. „Thurs. /�,� Fri. P.M.
3
Inspection Made_ 7 / 7 % c __._. (1 / ? — Lr� _rka
Inspector— _A2,