Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout1298 1298
I.
Phone No. GARFIELD COUNTY Address
945 -8241 BUILDING DEPARTMENT 2014 Blake Ave
Job Address 2065 County Road 311
Type OccuFiaxuy
Nature of Work Building Permit
Use of Building Expand & Enclose Porch
Owner Bobby Ray McPherson
Contractor R. E. Gordon
Amount of Permit $ 20.00 Date September 19. 1979
Toni E. Sherwood
Clerk
it
• Building Permit Application
N? 1127
1..,
Garfield County, Colo. co-,
. 7• /7 .
192
Owner: 5 y go � a / Yd e n 1.
Contractor or Builder: / / /C Can,n(n er
: Location: 206,r C o , Cf • 8 f/
r. Purpose for which building is to be used: er n y 1 .i nI enCin r _ /n rare%
1 :
Size of Lot:
g property 70 f l- ✓ AI � e'�`1' l i
Distance of building from line at: v n vnni in / r
Wit Front Rear
W; Left side —__ Right side
Distance from nearest building: / Number of stories:
Source of water supply: ' /.! /c /7 Number of rooms: /
. Type of sewage disposal: - r v c7
Type of foundation: .� /r. r l
Width of Building:__.._. / — Material in outside walls: // /i'cr irt -
Length of Building: / y Exterior Finish: AC Cite Kr s •
Height of walls: _ Type of roof: ' h �H
/ �s
Floor space in sq. ft.:
m
Estimated Cost: $ — 2 -m mo / /
Date construction will start: (C y' /_ c7 %Date of completion: _A/ v- 1 127
Permit Charge: $ _ or
1st $1,000 Valuation.
$________ per each additional $1,000 Valuation.
ao
TOTAL $ - X •- And I /We hereby agree to build strictly to the terms of the above description, and also to clear the
grounds adjacent street or streets of all rubbish and debris caused by the construction of said building.
Respectfully %fi
The County Commissioners hereby grant the above permit as per terms therein stated. This
/9
day of _ -r ] - . , 192j.
Building Inspector
Clerk
` GARFIELD COUNTY
`! STATE OF Colorado •
- •l /
• Office of Building Official �/ •
REQUEST FOR INSPECTION �
Date .�.�79 (4j� Permit No. /, y
Zile e � r PT.A, District No.
neeeived
Erg
Job Address LocaLocality Name .s /7rg n° y /9 C/ ff4(/ ar5An contractor
BUILDING / PLASTERING ELECTRICAL PLUMBING HEATING
, Foundation C f' ' ) 1 Wire ❑ Rough Wiring .0 Rough ❑ Rough ❑
Chimney P Lath ❑ Finish Wiring ..❑ F inal ❑ Final n F raming Scratch ❑ Fixtures ❑ Sewers ❑ Water Heater.. ❑
F inal ❑ Brown ❑ Motors. • ❑ Gas ❑
Finish ❑ Cesspool ........... ❑
Wallboard ❑
READY FOR INSPECTION A.M.
Mon, Tues. Wed. Thurs. OA Fri. P.M.
I Inspection Made r'c /2 2 / 76p JO el 2 fr .
Inspector `'t
'OaM 100.1