HomeMy WebLinkAbout2051 p
Na 00205 :1
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT 2014 Blake Avenue
Glenwood Springs, Colorado 81601
(303) 945-8241 / (303) 625 -3321
Job Address sl k Lot 23 - #1 Filing - Westbank Ranch'.
Nature of Work Bui lding Permit
Use of Building Garage - -
owner John Huebdinger Jr.
Contractor Owner
Amount of Permit: $ 24.00 Date: September 21, 1981
Susie Halley
Clerk
1. GARFIELD COUNTY ;;
Colorado
STATE OF
Office of Building Official
REQUEST FOR INSPLS'CTION
/�
Date _ � / Permit No.___ _____________ �Cl �/
Time 11 Or.
Received �/ L ' /' ',, .M. I^ Di er strict No.
`c5 7 A/c olci 6
e . - /, t.1 :One-./a
Job Anddiees�/ Locality
Owner
Name -C i Elg �JQO FLA PIG •lY l� L
- -Contractor_ -
UILDIN PLAS ING ELECTRICAL PLUMBING HEATING
Foundation ❑ Wire..— ❑ Rough Wiring.❑ Rough ❑ Rough ❑
Chimney ❑ Lath..______.._...❑ Finish Wiling..❑ Final ❑ Final ❑
Framing ❑ Scratch, _..._....❑ Fixtures - ❑ Sewers ❑ Water Heater.. ❑
Final ❑ Brown_._____...❑ Motors- 0 Gas ❑ •
F ootings 0 Finish__.__ ___ _..❑ Cesspool ❑
Weatherprf ❑ Wallboard ❑ Underground ❑
Insulation ❑ READY FOR INSPECTION A.M.
Mon. Tu e Wed, Thurs. OD
Inspection Mad . � E`r2 �is
�
Inspector A
ronM 300.1 - --
i"
BUILDING PERMIT APPLICATION
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
2014 Blake Avenue
Glenwood Springs, Colorado 81601
945 -8241 / 625 -3321
/
j Garfield County, Colorado, 9/° , 19 GPL
Owner: e /JAI gJE.B / AJ l 2 J
Contractor or Builder: Jo N AJ /JO P_ a / N 6 E2 r
Location: Lor a 3 F/GiA/6 */ ei}CST5,9n)iG 2, A
Purpose for which building is to be used: (,9 /7 Ale: .E
Size of Lot: a• es /3C
Distance of building from property line at
Front: / 00 Rear: 1 5o Left Side: / 7 .0 Right Side: 91/2
Distance from nearest building: Ci92■76r .9DD.77o) Number of stories:
Source of water supply: /vim Number of rooms: /
Type of sewage disposal: 79 4 Type of foundation: Co .0 c SL n96
Width of building: /..2 Material in outside walls: RL >
Length of building: «D Exterior finish: BCo c /C, Woo P
Height of walls: /� Type of roof: 6449/g ES
Floor space in square feet: 1 7 1 /0 .
Estimated value: $ .2 SO o -
Date construction will begin: 9/3- //t / Date of completion: `l" /— J/
Permit charge: $
Plan check fee: $
TOTAL: $ A r
And I /We hereby agree to build strictly to the terms of the above description, and also to clear the grounds and
adjacent street or streets of all rubbish and debris caused by the construction of said building.
Respectfully, •
`TV.� , . af: UC/
Si
The County Commissioners hereby grant the above permit as per terms therein stated. This day of
BUILDING OFFICIAL