HomeMy WebLinkAbout2874 littALDING PERMIT APPLICATION 1
GARFIELD COUNTY BUILDING DEPARTMENT
--1
Garfield County, Colorado, a — ) 1 , 19ta.
Owner: • A. _ 11 c. s - 114 .•
Address: Phone:
Address: Phone:
Contractor or Builder: Ze. L r/��
Q (Atr"f C`, / , i [
Location: -
Purpose for which building is to be used: _ Fa 1'Yt iit - - Neu, , cc.. 1
Size of Lot: C.. • il l S a. C ra 5
Distance of building from property line at i ��=
Rear: /oO Le S / � Right Side: 3
Front: �_ �� f' - -
Distance from nearest building: - L_196 Fe ‹...--1-- Number of stories: 1 S 7
Source of water supply: (/U� 1 1 Number of rooms: - 7
Type of sewage disposal: -kti Ta CO N r.
- rC - Type of foundation:
Width of building: a D - -- Material in outside walls: _ 1- -- —
Length of building: 7 0 I — Exterior finish: `J y .►_Cat —
Height of walls: _ Type of roof: — 110ffre1 a -- q � ' �
Floor space in square feet: 34 ~
Estimated value: $ J � �� /Y• //
Date construction will begin: L. Date of completion:-- -
Permit charge: $ 7" / 'd / ®a' 9-o IV , - Y
Plan check fee: $ X I f , / f f
TOTAL: $ .�
And I /We hereby agree to build strictly to the terms of the above description, and also to clear the grounds and
adjacent street or streets of all rubbish and debris caused by the construction of said building.
Respectfully, -
NOTE: If you are constructing a dwel g on a building site established by subdivision process
or SB 35 exemption prior to April 20, 1981 or if the parcel of land is more than 35 acres, you
may be subject to assessment of a $200.00 School Impact Fee prior to the issuance of a building
permit, as provided in Garfield County Resolution 81 -263 adopted as an amendment es to p the buildinc
code (see attached). / G�
The County Commissioners hereby grant the above permit as per terms therein stated. This 47 day of
dil" , 191 ,
"..,,,,,,41,„„ ,
U!LDING OFFICIAL
h -
Nature of Work
- .
Use of Building '
t
Owner
Contractor
Amount of Permit: $ Date:
. •., - •
NOTE: ALL CHECKS MUST BE MADE PAYABLE TO GARFIELD COUNTY TREASURER
Inspector must sign all spaces pertaining to this job
INSPECTION
DATE INSPECTOR
Foundations ,t
Setback 1 7 7 : 3 I i
Trench /7 -;.
Reinforcing
- '
Foundation Wall t i i /7 - "' 1 7q
Weatherproofing
Pour no concrete until above has been signed
Concrete Slab Floor
Electrical (Groundwork)
Plumbing (Groundwork)'
Gas Piping (Groundwork)
4, Do not pour floor until above has been signed
Rough Electrical (..)/L
Rough Plumbing 0 /- .
Rough Gas Piping
Rough Heating and Ventilation
(Above must be signed prior to framing ins -ction)
Insulation ( .9 yr;
•
Framing 1 9 k
Cover no work until above has been signed
Lath and Plaster (Interior)
• -
Lath
Scratch Coat
Brown Coat
• . Finish Coat
Wallboard
Lath and Plaster (Exterior)
Lath
Scratch Coat ,
Brown Coat
Finish Coat
Miscellaneous
Roofing
Sewer
Refrigeration
Electrical Underground
Final
Electrical Fixtures f5/14 r7A°
Plumbing Fixtures
Gas Piping
Heating and Ventilation
Job Completed
FORM 300.2 OA_ .c/7/8 5 X/4._
v:;;":