Loading...
HomeMy WebLinkAbout02485 - [ ra • , 4 yvr V ��tt I GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT Permit 1 \ . 2 4 8 J it 109 8th Street SUlte 303 Assessor's Parcel No. Glenwood Springs, Colorado 81601 a Phone.(303) 945 -8212 ti This does not constitute y INDIVIDUAL SEWAGE DISPOSAL PERMIT a building or use permit. 1 (; PROPERTY ' 3775 Chase St. Owner's Name Darrel & Hattie Hor resent Address Denver. CO 80212 Phone_ 421 -9936 f System Location 0147 Dolores Circle. Wastbank Mesa. Lot 5. Glenwood Springs t Legal Description of Assessor's Parcel No. I I SYSTEM DESIGN y4 Septic Tank Capacity (gallon) Other / / / - 1 I' (// / / is • , /i!1 /I i Percolation Rate (mihutes /inch) Number of Sr drooms (or other) 4 / y i (� I / C. f r . f_ /4. ., 1 C. .. - / l ... C r �/ �� Required Absorption Area - See Attached / l �; r �' A , /� I I / ✓, a / r r c ' • Special Setback Requirements: r. ✓ / / '' W 1- . � r n - _' 4 / r . - / • i. Date C /- . ` ry — 7 /- Inspector _. J. ... - .,. I (' - a.. r 4. fLA ,� FINAL SYSTEM INSPECTION AND APPROVAL (as installed) i Call for Inspection (24 hours notice) Before Covering Installation 1 f s w4 4Ths t. System Installer_ /t Septic Tank Capacity I i! Q 8 q dt Septic Tank Manufacturer or Trade Name /!tf -1 ilAOf -. 1% o Septic Tank Access within 8" of surface 1 7- 7 67 Absorption Area ! I.S d Absorption Area Type and /or Manufacturer or Trade Name -S % U . - - - } 4 Adequate compliance with County and State regulations /requirements Other 3 Date _- hj Inspector 7 ff , '' s q11' t, RETAIN WITH RECEIPT RECORDS AT CONStRUCTION SITE p *CONDITIONS: is 1. All installation must comply with all requirements of tht, Colorado State Board of Health Individual Sewage Disposal Systems Chapter j 25, Article 10 C.R.S. 1973, Revised 1984. 2. This permit is valid only for connection to structures which have Cully complied with County zoning and building requirements. Con - nection to or use with any dwelling or structures not approved by the Building and Zoning office shall automatically be a violation or a requirement of the permit and cause for both legal action and revocation of the permit. 3. Any person who constructs, alters, or installs an Individual sewage disposal system in a manner which involves a knowing and material variation from the terms or specifications contained in the application of permit commits a Class I, Petty Offense ($500.00 fine — 6 j , months in jail or both). x t Applicant: Green Copy Department: Pink Copy , Y .r • DUALS EW'AQE DISPOSAL SYSTEM APPLICATION OWNER DARREL AND HATTIE NORGREN ADDRESS 3775 CHASE STREET, DENVER, CO PHONE (303) 421 -5500 CONTRACTOR ALPINE C.M. INC. ADDRESS 1111 S. 12TH STREET, GRAND JCT., CO PHONE (970) 245 -2505 PERMIT REQUEST FOR (x) NEW INSTALLATION () ALTERATION O REPAIR Attach separate sheets or report showing entire area with respect to surrounding areas, topography of area, habitable building, location of potable water wells, soil percolation test holes, soil profiles in test holes (See page 4). LOCATDObLQEPRQEOSEI__FAGILLT_Y: COUNTY GARFIELD Near what City or Town GLENWOOD SPRINGS Lot 5 I.egal Description LOT 5, WESTRANK RANCH P.TI.D.. FTLING NO. 4 RESTIRTITVTSTON WASTES TYPE: (x) Dwelling ( ) Transient Use ( ) Commercial or Industrial ( ) Non - domestic Wastes ( ) Other - Describe BUILDING OR SERVICE TYPE: RESIDENTIAL Number of bedrooms: 4 Number of persons 2 (x) Garbage Grinder (x) Automatic Washer (x) Dishwasher SOURCE_ND TYPE O[ATER SUPPLY: () WELL () SPRING () STREAM OR CREEK Give depth of all wells within 180 feet of system: If supplied by communtty water, give name of supplier: GROUND CONDITIONS: Depth to bedrock: N/A Depth to first Ground Water Table: N/A Percent Ground Slope: 11% DISTANCE TO NEAREST COMMUNITY SEWER SYSTEM: N/A Was an effort made to connect to community system? N/A TYPE OF INDIVIDUAL SEWAGE DISPOSAL SYSTEM PROPOSED: ( Septic Tank ( ) Aeration Plant ( ) Vault ( ) Vault Privy ( ) Composting Toilet ( ) Recycling, potable use ( ) Pit Privy ( ) Incineration Toilet ( ) Recycling, other use ( ) Chemical Toilet ( ) Other - Describe: FINAL DISPOSAL BY: (x) Absorption Trench, Bed or Pit ( ) Evapotranspiration ( ) Underground Dispersal ( ) Sand Filter ( ) Above Ground Dispersal ( ) Wastewater Pond ( ) Other - Describe: WILL EFFLUENT BE DISCIIARGED DIRECTLY INTO WATERS OF THE STATE? No PER CnLATI(I•TEST1ilSULIS: (To be completed by Registered Professional Engineer) v Minutes 35 per inch in hole No. 1 - Minutes 25 per inch in T No. 3 Minutes 37 per inch in Thole No. 2 Minutes per inch in Hole No. _ Name, address and telephone of RPI? who made soil absorption tests: CTL THOMPSON, INC. 234 CENTER DRIVE, GLENWOOD SPRINGS, CO 81601, (970) 945 -2809 Nance, address and telephone of RPE responsible for design of the system: • Applicant acknowledges that the completeness of the appliction is conditional upon such further mandatory and additional tests and reports as may be required by the local health department to be made and furnished by the applicant or by the local health department for purposes of the evaluation of the application; and the issuance of the permit is subject to such terms and conditions as deemed necessary to inusre compliance with rules and regulations adopted under Article 10, Title 25, C.R.S. 1973, as amended. The undersigned hereby certifies that all statements make, information and reports submitted herewith and required to be submitted by the applicant are or will be represented to be true and correct to the best of my knowledge and belief and are designed to bre relied on by the local department of health in evluating the same fro purposes of issuing the permit applied for herein. T further understand that any falsification or misrepresentation may result in the denial of the application or revocation of any permit granted based upon said application and in legal action for perjury as provided by law. Signed e /__>! / , . Date AUGUST 9, 1995 • L'LEASP DRAW AN AC .11RAT_ILMAPTnYOUILBRDPERTY • TO HIGHWAY 82 ROARING FORK HUEBINGER RIVER DRIVE • SITE N DELORES CIRCLE _ COUNTY RD. 109 VICINITY MAP NO SCALE - G ,.....--- /-------</: ----- --diX (o'L4PO .-- ler L/ 7 • ..... - ... 7---- .... - ------ - ------- P i t o •_ \‘.,,,,a0__,_, "J.) 7:\ .. 1 r- V ''''..-> 7 r - .- \\, \ /7 c_....i \ , i ( SEWAGE DISPOSAL SYSTEM -L- -\ V- A \ 1 K\ : \ L , LOT 5, FILING NO. 4 WESTBANK RANCH P.U.D.- - \ \ ., , i BUILDING ENVELOPE 6 e6 \ ON \ � so 1► N i co 50"W n v � s2- . 0 6 — J w.c. N2 8 ° 5 \ - - -- s3.00' c� I � °, 1 73.06' — 1 0 co O v W IN Cil I I Pi _� Ir D I pa m W cn o \ � I ,_ ] N oo I z 25.37' S19 °05'09 " �, �� J c .ti�L �N 7 co \ \�<�° 0 I � fTl \ �� \42' �� /� 'v Q2 j � 2 22 9 OO 5 6 . ( 5) , 2 \ C \ J • 4 qti/ skfr o 00 r t0 / . . 40 0 40 80 120 1 .. 1111■1111111.11M■ GRAPHIC SCALE IN FEET 1 INCH = 40 FEET - - THIS DRAWING IS FOR FINAL PLAT INFORMATIONAL PURPOSES INDIVIDUAL LOT DETAILS .1:\ HESTBANK RANCH P.U.D. 5 ONI Y, AND IS NOT TO BE ' " 't FILING NO.4 RESUBDIVISION USED FOR ESTABLISHING A s.0m I °" w•,t in. end. r � v� � - a .. LEGAL BOUNDARIES. ". ."J °L."•:•... • • • • • 0 r' z rn N 0 0 CTL /THOMPSON, INC., CONSULTING ENGINEERS n O SOILS AND FOUNDATION INVESTIGATION PROPOSED NORGREN RESIDENCE LOT 5, WESTBANK MESA RANCH • GARFIELD COUNTY, COLORADO • Prepared For: Alpine C.M., INC. 1111 South 12th Street Grand Junction, CO 81501 Attention: Mr. Rob Griffin • aVs-asas • Job No. GS -1585 August 3, 1995 • CTL /THOMPSON, INC. CONSULTING ENGINEERS 234 CENTER DRIVE • GLENWOOD SPRINGS, COLORADO 81601 • (970) 945 -2809 • TABLE OF CONTENT SCOPE 1 SUMMARY OF CONCLUSIONS 1 SITE CONDITIONS 2 PROPOSED CONSTRUCTION 2 SUBSURFACE CONDITIONS 3 SITE GRADING 3 FOUNDATIONS 4 FLOOR SLABS AND EXTERIOR CONCRETE FLATWORK 5 BASEMENT WALLS 6 SURFACE DRAINAGE 7 PERCOLATION TESTS 7 LIMITATIONS 7 FIGURE 1 - LOCATIONS OF TEST HOLES • FIGURE 2 - SUMMARY LOGS OF TEST HOLES FIGURES 3 AND 4 - SWELL /CONSOLIDATION TEST RESULTS FIGURE 5 - EXTERIOR FOUNDATION WALL DRAIN • FIGURES 6 THROUGH 8 - PERCOLATION TEST RESULTS TABLE I - SUMMARY OF LABORATORY TESTING • ALPINE C.M., INC. cTLlr OS-1585 • SCOPE This report presents the results of our soils and foundation investigation for the proposed Norgren Residence to be built at Lot 5, Westbank Mesa Ranch in Garfield County, Colorado. We explored the subsurface conditions at the lot to provide foundation recommendations for the building. This report includes a description of the subsurface conditions found in our test holes, a recommended foundation system and geotechnical criteria for it and construction criteria for details influenced by the subsoils. Our report was prepared from data developed during • our field exploration, laboratory testing, engineering analysis and our experience with similar conditions. A summary of our conclusions is presented below. • SUMMARY OF CONCLUSIONS 1. Our test holes penetrated 0.5 feet of organic sandy clays above 6 to 11 feet of stiff to very stiff, silty to sandy clays above 6 to 10 feet of medium dense to very dense, clayey to silty sands underlain by dense to very dense, silty to sandy gravels. No free groundwater was found in our test holes during our field Investigation. 2. We recommend founding the building on footings bearing on the native soils. A maximum soil bearing pressure is presented in the • "Foundation" section. 3. Moisture variations in the subsoils should be limited. Careful attention should be given to precautions discussed under "Surface Drainage ". 4. A ground surface slope away from the building should be maintained • at all times to reduce the risk of wetting soils below the foundation. We recommend landscaping schemes using native vegetation and requiring minimal irrigation near the building. • ALPINE C.M., INC CTL(T GS-1565 1 • SITE CONDITIONS Westbank Mesa Ranch is located In southeast Garfield County, Colorado. The site Is located on an alluvial terrace in the southwest portions of the Roaring • Fork River Valley approximately 1 to 2 miles south of Glenwood Springs, Colorado. Access to the site is via Highway 82 to County Road 109 to Huebinger Drive to Delores Circle. • Ground surfaces at Westbank Mesa Ranch slope to the northeast from high points along a southeast to northwest trending ridge down to and across a relatively flat upper benched area. Steep northeast facing slopes descend from the upper benched area to a lower benched area. The original part of Westbank Ranch • Development is located adjacent to the site to the northeast with the Roaring Fork River beyond. • Lot 5 is on the comparatively flat to moderately sloped upper benched surface east of Delores Drive. Sage, native grasses and weeds cover ground surfaces on a majority (south part) of the site. Ground surfaces on parts of the site on the upper bench slope down to the southwest at grades measured and visually estimated at 5 to 15 percent and ground surfaces on the north part of the site slope down to the lower benched area (north) at grades measured and visually estimated at 30 to 50 percent. The lot is on the edge of the upper bench and the north facing slopes that drop down to the lower bench. The Roaring Fork Valley bottom is viewed to the north east. Vegetation is sage, native grasses and weeds on the upper bench and pinon and Juniper trees with brush and weeds on the north facing slopes below the bench. • PROPOSED CONSTRUCTION A three story, wood frame, single family residence is planned. The lower • level will be a walkout basement with slab -on -grade floors. The building exterior will be a stucco veneer. Maximum excavations for the basement will be 10 feet deep. ALPINE C.M., INC. CTLR GS -1585 2 • For our analysis we assumed foundation loads of between 1,000 and 3,000 pounds per lineal foot for exterior bearing walls and up to 15 kips for Isolated column footings. We should be Informed if actual construction is different than described above to allow re- evaluation of our recommendations and conclusions presented herein. SUBSURFACE CONDITIONS We explored subsurface conditions by drilling three (3) test holes and three (3) percolation holes at the locations shown on Figure 1. Drilling was directed by our engineering geologist who logged the test holes and obtained samples for _ testing in our laboratory. Summary logs of our test holes and results of penetration resistance tests are shown on Figure 2. Results of laboratory testing are shown on Figures 3 and 4 and on Table I. Our test holes penetrated 0.5 feet of organic sandy clays above 6 to 11 feet of stiff to very stiff, silty to sandy clays above 6 to 10 feet of medium dense to very dense, clayey to silty sands underlain by dense to very dense, silty to sandy gravels. No free groundwater was found in our test holes during our field investigation. SITE GRADING No part of the building foundation will be on fill, however, fill may be needed to achieve subgrade elevations for slabs -on -grade floors and exterior concrete flatwork. Areas to receive fill or bear slabs -on -grade should be grubbed and stripped of vegetation, debris or other deleterious material. The resulting surface should be scarified to at least 8 inches deep, moisture conditioned to within 2 percent of optimum moisture content and compacted to at least 95 percent of the standard Proctor maximum dry density (ASTM D 698). Fill can consist of on -site soils free of organics, rock larger than 3 Inches in diameter or other deleterious • material. Fill should be placed in 6 Inch maximum loose lifts, at 2 percent below to ALPINE C.M., INC CTL/T GS-1585 3 • 2 percent above optimum moisture content and compacted to at least 95 percent of ASTM D 698. We understand that maximum excavations will be 10 feet deep. Excavation sides should be sloped or braced. Excavated slopes will tend to collapse and flatten. We believe the sandy to silty clays and clayey to silty sands that occur at this site are Type B as described in the October, 1989 Occupation Safety and Health Administration (OSHA) Standards published by the Department of Labor governing excavations. The publication indicates a maximum temporary slope of 1 to 1 (horizontal to vertical) for Type B soils above the water table. We recommend temporary excavation slopes be 1 to 1 (horizontal to vertical) or flatter. Soils removed from excavations should not be stockpiled at the edge of the excavations. We recommend the excavated soils be placed at a distance from the top of the excavation equal to at least the depth of the excavation. • Free groundwater was not encountered in our test holes. We do not believe free groundwater will be encountered in excavations at this site, however, depending upon cut depths and the time of year water may be present. During spring runoff • water from snowmelt may develop a perched groundwater table near the ground surface. If free groundwater is encountered in excavations, temporary excavation slopes recommended above may not be stable and could fail. We should be informed Immediately if groundwater is encountered to allow geotechnical input. • FOUNDATIONS In our opinion, the building can be founded with footings bearing on the native soils. The footings should be designed and constructed with the following criteria. 1. The footings should bear on the native sous and be designed for a • maximum soli bearing pressure of 3000 psf. Materials loosened during the excavation or forming process should be removed from the footing areas prior to placing concrete; ALPINE C.M., INC. CTIJT 05.1555 4 • 2. Foundation walls for continuous footings should be reinforced top and bottom, to span loose soil pockets. We recommend reinforcing steel equivalent to that required for a simple span of 12 feet. Reinforcement should be designed by a qualified structural engineer; 3. Minimum footing sizes are desirable. We suggest a minimum width of 16 inches for continuous footings and a size of at least 2 feet by 2 feet for Isolated column pads. Larger sizes may be required based on the structural loads; 4. The soils under exterior footings should be protected from freezing. The depth normally assumed for frost protection in Garfield County is 36 Inches. We recommend contacting the local planning department to verify the depth of protection required; 5. We should be requested to inspect the completed foundation excavations to confirm subsurface conditions exposed are as anticipated from our test holes. FLOOR SLABS AND EXTERIOR CONCRETE FLATWORK The lower level floor, garage floors, patios and sidewalks will be slabs-on- grade. Slabs -on -grade can bear on the prepared subgrade or fill as discussed above under "Site Grading ". If moisture content Increases significantly In the soils below slabs -on- grade, cracking of the slabs should be expected. We recommend the following design and construction details for slabs -on- • grade: 1. Slabs -on -grade should be constructed directly on the prepared subgrade or fill as discussed under "Site Grading ". Provision of a sand or gravel layer increases the possibility of a single source of water wetting the entire area supporting the slabs and should deleted • if planned; 2. Slabs should be separated from exterior walls and interior bearing members with a joint which allows free vertical movement of the slabs; • 3. Slab- bearing partitions should be minimized. Where such partitions are required, a slip Joint should be constructed to allow free vertical movement of the slabs; ALPINE C.M., INC. CTL(T MOM 5 • 4. Door Jambs, sheet rock and other construction details should be constructed to allow vertical movement of slabs -on -grade floors; 5. Eliminate undersiab plumbing as much as possible. Where such plumbing Is unavoidable, It should be pressure tested before the slabs are constructed; 6. Plumbing and utilities should be constructed with a joint which allows slabs to move freely; 7. All connections between furnaces and duct work should be provided with a flexible connection to allow free movement in the event of slab movement. The above precautions will not prevent movement of the slabs -on -grade floors in the event the soils become wet, they will reduce the potential damage when movement occurs. BASEMENT WALLS Foundation walls will be subject to lateral earth pressure. These walls are restrained and cannot move, therefore, they should be designed for the Hat rest" lateral earth pressure. Assuming on -site soils will be used as backfill, we recommend using an equivalent fluid density of 50 pcf to calculate lateral earth • pressure. The above equivalent fluid density does not include allowances for sloping backfill, hydrostatic pressures, live loads or loads from adjacent structures. Water from surface run -off (e.g. precipitation, snow melt, irrigation) frequently • flows through the backfill adjacent to foundation walls and collects on the surface of the undisturbed soils occurring at the bottom of the foundation excavation. This can cause damp or wet conditions In the basement and wetting of below foundation • soils. To reduce the risk of accumulation of water we recommend a foundation drain. The drain should consist of a 4 inch diameter open joint or slotted P.V.C. pipe • encased in free draining gravel. The drain should lead to a positive gravity outfali. A typical foundation drain detail is shown on Figure 5. Backfili placed adjacent to ALPINE C.M., INC CTL(r 08-1585 6 • V _ foundation walls should be moisture treated and compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698). SURFACE DRAINAGE The performance of foundations and concrete flatwork la influenced by the moisture conditions in the subsoils. Wetting of below foundation soils can be reduced by planned and maintained surface drainage. Wetting or drying of the open foundation excavation should be avoided. The ground surfaces surrounding the building should be sloped to provide rapid run -off of water away from the building in all directions. We recommend a slope of at least 12 inches In the first 10 feet. We recommend that landscaping be with native vegetation which requires little or • no irrigation water. If sod and landscaping shrubbery is to be part of the landscaping scheme near the building we recommend no irrigation sprinkler heads be within 5 0 '� feet of the building and they should be directed away from the building. We �• recommend sod not be placed within 5 feet of the building. Where Irrigation is • required within 5 feet of the building, Irrigation should be by hand watering. Roof downspouts and drains should discharge well beyond the limits of all backfill. Splash blocks or downspout extensions should be provided at all discharge • locations. P RCOLATION TESTS • We performed percolation tests in our percolation holes P -1 through P -3. e Based on our test results standard percolal n fiPk s are appropriate. We recommend uslna a design percolation rate 40 min /inch) Percolation test results are presented on Figures 6 through 8. • ...., UMITATiONS • Our test holes were spaced to obtain a reaso 4 ly accurate picture of the subsurface. Variations In the subsurface conditions not dicated by our test holes ALPINE C.M., INC CTL/T GS•1585 7 • will occur. We should observe the completed excavation to confirm the soils are as anticipated from our test holes. Our report was based on conditions disclosed by our test holes, results of laboratory testing, engineering analysis, and our experience. Criteria presented reflects the proposed building as we understand it. We should be advised if the final design differs from our assumptions to permit us to re- evaluate our conclusions. This investigation was conducted in a manner consistent with the level of care and skill ordinarily exercised by geotechnical engineers currently practicing under similar conditions in the locality of this project. No other warranty, express or implied, is made. If we can be of further service or if you have questions regarding this report, please call. • Very truly yours, CTL/THOM� N� Wilson L. "Liv" Bowden Engineering .IGI ) • ' Rev)ewecj • i/- Jo = P. `7 13 inch Mart i; ; . •����`f� L NF LB:JM:cd (3 copies sent) NV ALPINE C.M., INC CTLR 081585 8 • PROPOSED N0RGREIN RESIDENCE LOT 5, W EST BAN K M1:-A RANCII GARFIELi) COUNT) , ('01,0RADO TO HIGHWAY 82 ROARING FORK HUES INGER RIVER is DRIVE Y 0 I. ---0 ' Or . ' - - -� SITE �� ` \.,\ \� _ DELORES CIRCLE _ -�- �"-- COUNTY RD. 109 \ %lar . ii:ar___, ___ �___ ` VICINITY MAP NO SCALE 6240 62 30_ �— _ -- __ \ A � - - _ _ ma 'r ' 60 TH -2 I \ ` ` • _ h 2 0 ' I II\ \ PLAN ED B ILDI G _ I , F 0 P i / / 1 LO ar c 4 �0 \--) , ' s 0 I:) \\ . SCALE.: 1" = 60' ,�, LOCATIONS OF TEST 1101,ES Job No. GS-1585 Fig. 1 TH -1 TH -2 TH -: EL =6268 EL =6264 EL =62• 6270 Assumed — o.. Finished Floor — Elevation — 6265 / • 14/12 / e - / // 1 /... tac — 6260 / / /�] 10/12 / II 28/12 o -. / / a) k• / / I A a q 6255 �] 37/12 1 I -- 9. /,% •W ?> — 6250 i.' ?•. .• y.� 13/12 � 1, � • •0 50/9 i.. Q� .• = 6245 : • r y 0 i— P. ‘ 6 0 240 ii 0 Ale 7 1 .n= — 6235 P -1 P - 2 P -3 1 '' ^ 0 p CD 1 1 < Cs. - I q — 2 / 2 i-• 3 / / 3 — 4 4 1 P. ,_ 5 5 n SUMMARY LOGE 4 Job No. GS -1585 62 70 — 6265 — LEGEND: • = ® Clay, sandy, organic, soft, moist, brown. (OL) 6260 — ® Clay, sandy to silty, stiff to very stiff, slightly moist to moist, brown. (CL) _ Sand, clayey to silty, medium dense to very 121/12 �= a dense, slightly moist to moist, brown. (SC, SM) 0 6255 — Gravel, silty to sandy, dense to very dense, p slightly moist to moist, brown. (GM, GP) -a rb • 144/12 — Drive sample. The symbol 14/12 indicates co that 14 blows of a 140 pound hammer 6250 falling 30 inches were required to drive a 2.5 inch O.D. sampler 12 inches. • 6245 — NOTES: 1. Test holes were drilled on July 15, and August 1, 1995 with a 4 inch diameter continuous flight power auger. 6240 — 2. Elevations were obtained from topographic mapping prepared by Jerome Gamba & Associates, Inc and are approximate. • 6235 — 3. No free groundwater was found in our test holes the day of drilling. 4. These test holes are subject to the explanations, limitations and conclusions as contained in this report. OF TEST HOLES Fig. 2 1 V ' ■ i 1 I iI; 11I I 1 1 1 I I I I ■ _ 5 1 t!' i f l I I I � ■ _ 1 i._ i I I , 1 1 4 I , C I I 1 o AQDIT1IO. L COMPRESSIbN UNDER 1 I I �� ( , 1CON5TAN TiPRESSUR - D9 TO WET 1 ,i t ' I 1 • 1 Ii I I 1 1 1 '1 ! i I • be Z 6 I - I l O . . 1 ' : 0 I • 2 0 8 ,. 0.1 1.0 10 100 APPLIED PRESSURE — KSF Sample of CLAY. SAN (CL) NATURAL DRY UNIT WEIGHT= 97 PCF • From T1 AT 4 FEET NATURAL MOISTURE CONTENT= _ 5 ' 2 % Swell Consolidation • Test Results JOB NO. GS -1585 FIG. 3 i ; 'II l I I i II j) r1( -; i II • I X I iI I , a i i s i; _ i I , _ I I 1,I 1 ' Ii 1 a. W , 1 i I ADDITIONAL COMPRESSION UNDER ' rONSTANT PRESSURE DUE TO WETTING _ ; O w I ' Z s ! i If 1 4i_ • S ( I ill i 1 I at 6 Z 1 1 , r , , , , 1 , , I At 0 U e, : I I .' 1 0.1 1.0 10 100 APPLIED PRESSURE — KSF Sample of CLAY, SANDY (CL) NATURAL DRY UNIT WEIGHT= 91 PCF • From_ TI AT 9 FEET NATURAL MOISTURE CONTENT= 10.0 % Swell Consolidation O JOB N0. GS -1585 Test Results FIG. 4 L H 1- 1 NOTE: SLOPE 1 DRAIN SHOULD BE AT LEAST 2 INCHES PER REPORT S BELOW BOTTOM OF VOID AND FOOTING AT THE HIGHEST POINT AND SLOPE DOWNWARD TO A POSITIVE GRAVITY OUTLET OR TO A SUMP WHERE WATER CAN BE REMOVED BY PUMPING. C - BACKFILL PROVIDE PVC SHEETING GLUED TO FOUNDATION WALL TO REDUCE BELOW GRADE WALL MOISTURE PENETRATION. SLOPE ENCASE PIPE IN WASHED REINFORCING STEEL PER CONCR AGGREGATE ( PER STRUCTURAL OSHA C33, NO. 57 OR NO. 67). DRAWINGS. EXTEND GRAVEL TO AT LEAST 1/2 HEIGHT OF FOOTING. • PROVIDE POSITIVE SLIP JOINT • •, BETWEEN SLAB AND WALL. COVER GRAVEL WITH j FLOOR SLAB FILTER FABRIC OR ROOFING FELT. # I , FOOTING OR PAD \I. a2 MINIMUM 8" MINIMUM OR BEYOND 1:1 SLOPE FROM BOTTOM OF FOOTING. (WHICHEVER IS GREATER) 4 -INCH DIAMETER PERFORATED DRAIN PIPE. THE PIPE SHOULD BE LAID IN A TRENCH WITH A SLOPE RANGING BETWEEN 1/8 INCH AND 1/4 INCH DROP PER FOOT OF DRAIN. w EXTERIOR FOUNDATION WALL DRAIN • JOB NO. GS -1585 FIG. s PERCOLATION TEST SATURATION AND PREPARATION DATE: 7/17/95 DATE: 7/15/95 WATER IN BORINGS AFTER 48 HOURS TIME AT START OF SATURATION: 1 IYES LINO PERCOLATION TEST RESULTS TIME AT TIME DEPTH TO WATER CHANGE PERCOLA J. HOLE DEPTH START OF END OF IN WATER TION RATE START OF INTERVAL NUMBER (INCHES) INTERVAL INTERVAL DEPTH (MIN /INCH) INTERVAL (MINUTES) (INCHES) (INCHES) (INCHES) P -1 43.75 12:55 30 20.50 22.00 1.50 20 1:25 30 22.00 22.75 0.75 40 1:55 30 22.75 23.50 0.75 40 2:25 30 23.50 24.25 0.75 40 • 2355 30 24.25 25.00 0.75 40 30 25.00 25.75 0.75 40 30 25.75 26.50 0.75 4 0 • • • JOB ND. GS -1585 1 FIG. 6 PERCOLATION TEST SATURATION AND PREPARATION DATE: 7/17/95 DATE: 7/15/95 WATER IN BORINGS AFTER 48 HOURS TIME AT START OF SATURATION: fl]YES rd NO PERCOLATION TEST RESULTS - TIME AT TIME DEPTH TO WATER CHARGE PERCOLA HOLE DEPTH START OF END OF IN WATER TION RATE START OF INTERVAL INTERVAL INTERVAL NUMBER (INCHES) INTERVAL (MINUTES) DEPTH (MIN /INCH) (INCHES) (INCHES) (INCHES) P -2 42 12:55 30 22.00 23.25 1.25 24 , 1125 30 23.25 24.25 1.00 30 1:55 30 24.25 24.75 1.50 90 2:25 30 24.75 25.50 0.75 40 a 2:55 30 25.50 26.00 0.50 60 w 3:25 30 26.00 26.50 0.50 An 3:55 30 26.50 26.75 0.25 120 • e • • • • FIG. 7 JOB ND. G5 -1585 PERCOLATION TEST SATURATION AND PREPARATION DATE: 7/17/95 DATE: 7/15/95 WATER IN BORINGS AFTER48 HOURS TIME AT START OF SATURATION: 1 IVES [9NO PERCOLATION TEST RESULTS TIME AT TIME DEPTH TO WATER CHANGE PERCOLA HOLE DEPTH START OF END OF IN WATER TION RATE START OF INTERVAL INTERVAL INTERVAL NUMBER (INCHES) DEPTH (MIN /INCH) INTERVAL (MINUTES) (INCHES) (INCHES) (INCHES) P -3 44 12:55 40 22.00 23.50 1.50 9[1 1:25 30 23 50 24.75 1.25 24 1 :55 30 24.75 25.75 1.00 30 2 :25 30 25.75 27.00 1.25 24 a 2:55 30 27.00 28.25 1.25 24 w - 3:25 30 28.25 29.50 1.25 24 3:55 30 29.50 30.50 1.00 30 • 4 4. 40 • • FIG. 8 JOB NO. 65-1585 W U U N V o V a r _I r r iu r r a. 0 U N N U' U V N U 0 0 ' 6 O O Z z o W .� a a u> M N N W i 'D a '0 N O I- a. z N -J r CO z W � gY us • 1— in W W D a • F" 8 8 N cc W >= 1 M o 4 h t, — w F- =I Wa 1 I • m 4 z O y v 1 4 ct D U F O f 4 f Fr- J e w • Li- rc 9 r r W Q I M N O r : -Jv >- 4 X _1 r 4 et F t r M o .+ M • f o a Ch rn 0 N -I W Q D N I N M' N O N • cr P- e • N Ol M N O M H �I .- • z f 1 i F 1 a w a rn i rnl I a rn a j o ~ 1 ~ I 1 • i !Hi Li I N O f f 2 I- I- • • • • • • • CTL/Thompson, Inc. 1971 West 12th Avenue Denver, Colorado 80204 (303) 825-0777 Commercial Testing Laboratories, Inc. • 22 Lipan Street Denver, Colorado 80223 (303) 825-3207 CTUThompson, Inc. 5240 Mark Dabling Blvd. Colorado Springs, Colorado 80918 • (719) 528-8300 CTUThompson, Inc. 234 Center Dr. Glenwood Springs, Colorado 81601 (970) 945 -2809 • • •