Loading...
HomeMy WebLinkAbout02877 -___ _..- .,�.,.,...-- •-°-•• _-- •.- --- e.�- r.�, -- .,�.n.- ,pq•�y.,.rgfMaR'wRln�q r P:. .. ,. :_ w . GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT Permit 2877 109 8th Street Suite 303 A is Parcel No. Glenwood Springs, Colorado 81801 Phone (309) 945 -8212 This does not constitute INDIVIDUAL SEWAGE DISPOSAL PERMIT a building or use permit. PROPERTY owner's Name Clinton Sheridan Present Address 61 Morningstar, Parachutq, 285 -7479 System Location 0 4 O 4 Grass Mesa Ranch, Lot 37, Rifle 3 J 9- S S'' Legal Description of Assessor's Parcel No. SYSTEM DESIGN /.2 (D Septic Tank Capacity (gallon) Other � 41u410 M19O 44cM. Percolation Rate (minutes/inch) Number of Bedrooms (or other) ln Required Absorption Area - See Attached 3 9 , { _. / 1M Q Special Setback Requirements: ` 3 0 l't' d Date /6 ^ 9' 7 / Inspectord"�"Z - FINAL. SYSTEM INSPECTION AND APPROVAL (as installed) Call for Inspection (24 hours notice) Before Covering Installation a System Installer Septic Tank Capacity 4.2 co � /�� Septic Tank Manufacturer or Trade Name /• An' t2 Septic Tank Access within 8" of surface v Absorption Area # f t 2 `- / ' f � / ar k-. ) few 'f,0 2 r— MA�'� 7 / y r i Absorption Area Type and /or Manufacturer or 'Cade Name 2 X b Adequate compliance with County and State regulations/ /requirements Other L�'''' s ,,,, �1 Date ! -2/ ^ 7191 inspector o+� � ' � v, � RETAIN WITH RECEIPT RECORDS AT CONSTRUCTION SITE *CONDITIONS: 1. All Installation must comply with all requirements of the Colorado State Board of Health Individual Sewage Disposal Systems Chapter 25, Article 10 C.R.S. 1973, Revised 1984. 2. ThIS permit is valid only for connection to structures which have fully complied with County zoning and building requirements. Con- nection to or use with any dwelling or structures not approved by the Building and Zoning office shall automatically be a violation or a requirement of the permit and cause for both legal action and revocation of the permit. 3. Any person who constructs, alters, or installs an individual sewage disposal system in a manner which involves a knovfting and material variation from the terms or specifications contained in the application of permit commits a Class I, Petty Offensb1$$500.00 fine -8 months in Jall or both). White - APPLICANT Yellow - DEPARTMENT INDIVIDUAL SEWAGE DISPOSAL SYSTEM APPLICATION OWNER _ C\%r\ `r k SV1 ,(2_Aa0.X-\ 2� ADDRESS • t • • t ts.l ■ ILL- _ . �� a ""PHONE aSS l9 CONTRACTOR 5 E ADDRESS PHONE PERMIT REQUEST FOR (X) NEW INSTALLATION ( ) ALTERATION ( ) REPAIR Attach separate sheets or report showing entire area with respect to surrounding areas, topography of area, habitable building, location of potable water wells, soil percolation test holes, soil profiles in test holes (See page 4). LOCATION OF PROPOSED FACJI Near what City of Town 7E., Size of Lot 1 Z 1 (. _ \ Legal Description or Address S-3 3CVC c- ?2 — 4o 5 - WASTES TYPE: (7-.<1 DWELLING ( ) TRANSIENT USE ( ) COMMERCIAL OR INDUSTRIAL ( ) NON - DOMESTIC WASTES ( ) OTHER - DESCRIBE BUILDING OR SERVICE TYPE: PL)€ \I ■ •t Y ts1/4J 9"■.. Number of Bedrooms ,25. Number of Persons 4 (XL Garbage Grinder ( ) Automatic Washer (>1 Dishwasher • 1: E : U• YPE •F W • T ' • • Y: • • WELL ( ) SPRING ( ) STREAM OR CREEK If supplied by Community Water, give name of,supplier: DISTANCE TO NEAREST COMMUNITY SEWER SYSTEM: Sc fvtd ess Was an effort made to connect to the-Community System? ND A site plan is required to he submitted that indicates the following MINIMUM distances: Leach Field to Well: 100 feet Septic Tank to Well: 50 feet Leach Field to Irrigation Ditches, Stream or Water Course: 50 feet Septic System to Property Lines: 10 feet YOUR INDIVIDUAI, SEWAGE DISPOSAL SYSTEM PERMIT WILL NOT BE ISSUED WITHOUT A SITE PLAN. GROIJND CONDITIONS: Depth to first Ground Water Table Percent Ground Slope 2 TYPE OF INDIVIDUAL SEWAGE DISPOSAL SYSTEM PROPOSED: (.<); SEPTIC TANK ( ) AERATION PLANT ( ) VAULT ( ) VAULT PRIVY ( ) COMPOSTING TOILET ( ) RECYCLING, POTABLE USE ( ) PIT PRIVY ( ) INCINERATION TOILET ( ) RECYCLING, OTHER USE ( ) CHEMICAL TOILET ( ) OTHER - DESCRIBE FINAL DISPOSAL BY: (j(') ABSORPTION TRENCH, BED OR PIT ( ) EVAPOTRANSPIRATION ( ) UNDERGROUND DISPERSAL ( ) SAND FILTER ( ) ABOVE GROUND DISPERSAL ( ) WASTEWATER POND ( ) OTHER - DESCRIBE WILL EFFLUENT BE DISCHARGED DIRECTLY INTO WATERS OF THE STATE? -) D PERCOLATION TEST RFSI1 TS: (To be completed by Registered Professional Engineer, if the Engineer does the Percolation Test) Minutes 30 per inch in hole No. 1 Minutes go per inch in hole NO. 3 Minutes 6 0 per inch in hole No. 2 Minutes per inch in hole NO. _ Name, address and telephone of RPE who made soil absorption tests: HP.Pcuarlir pasAr_k Grnt en al 5 0 «x!314 91le nvoorl Sptlivs (.p guar 910 ?u' 71e5 Name, address and telephone of RPE responsible for design of the system: Applicant acknowledges that the completeness of the application is conditional upon such further mandatory and additional tests and reports as may be required by the local health department to be made and furnished by the applicant or by the local health department for purposed of the evaluation of the application; and the issuance of the permit is subject to such terms and conditions as deemed necessary to insure compliance with rules and regulations made, information and reports submitted herewith and required to be submitted by the applicant are or will be represented to be true and correct to the best of my knowledge and belief and are designed to be relied on by the local department of health in evaluating the same for purposes of issuing the permit applied for herein. I further understand that any falsification or misrepresentation may result in the denial of the application or revocation of any permit granted based upon said application and in legal action for perjury as provided by law. r 8 / 7 A Signed �.t�. ✓i. a/ / /A „I d Date FAA PLEASE DRAW AN ACCURATE MAP TO YOUR PROPERTY!! 3 r N O „0.. 73 40 z 11 �z W y 7 at TE L O S 7 L 0 T = 0 3 � 0 0'C U . O • G O CAi, 0 CO U L. c d y y W 03 Co E o 3 03 z a) C Co tel C • _ N 0 -0 H .0 e rn P E 7. 1 R 7 7 0 v y o ° O z 0 O T O 0 F., " l. LE E Z o to 7 7 4) y a) z O o H c H 0 V C boa? C 'a. 2 14 a) E .0 E 0 .E 7 z ;a 6. a) o -a N CA 0 0 2 = t y §: 3 c ° 0 a) 0 O al 0 w z 00 . m 0 rat ssoy Q Q (� T v y 4 L 0 0 C a 0 -o U onQ I. a) Z g O 2 OA = F a 0 co >z u HEPWORTH- PAWLAK GEOTECHNICAL, INC. Glenwood Springs, CO 81601 August 4, 1997 Fax 970 945-8454 Phone 970 945 -7988 Clint Sheridan 61 Morning Star Battlement Mesa, Colorado 81635 Job No. 197 434 Subject: Subsoil Study for Foundation Design and Percolation Testing, Proposed Sheridan Residence, Lot 37, Grass Mesa Subdivision, Garfield County, Colorado. Dear Mr. Sheridan: As requested, Hepworth- Pawlak Geotechnical, Inc. performed a subsoil study for design of foundQns at the subject site. The study was conducted in accordance with our agreement for geotechnical engineering services to you dated July 7, 1997. The data obtained and our recommendations based on the proposed construction and subsurface conditions encountered are presented in this report. Proposed Construction: The proposed residence will consist of a one story modular unit over a walkout basement level. The basement floor will be slab -on- grade. Cut depths are expected to range between about 4 to 6 feet. Foundation loadings for this type of construction are assumed to be relatively light and typical of the proposed type of construction. If building conditions or foundation loadings are significantly different from those described above, we should be notified to re- evaluate the recommendations presented in this report. Site Conditions: Lot 37 is a 40 acre parcel located in an area known as Grass Mesa. Vegetation in the building area consist mostly of grass, weeds and sage brush with juniper and pinyon trees to the west of the building area. The terrain is gently rolling with slight to moderate slopes down to the north. There is about 6 feet of elevation difference across the building site. Numerous basalt cobbles and small boulders are visible on the ground surface. Subsurface Conditions: The subsurface conditions at the site were evaluated by observing two previously excavated pits at the approximate locations shown on Fig. 1. The logs of the pits are presented on Fig. 2. The subsoils encountered, below about foot of topsoil, consist of basalt rock fragments in a sandy silt matrix. Results of a gradation analysis performed on a sample of silty sandy gravel (minus 5 inch fraction) obtained from the site are presented on Fig. 3. No free water was observed in the pits at the time of our site visit and the soils were slightly moist to moist. Foundation Recommendations: Considering the subsoil conditions encountered in the exploratory pits and the nature of the proposed construction, we recommend spread footings placed on the undisturbed natural soil designed for an allowable soil bearing k :. Clint Sheridan August 4, 1997 Page 2 pressure of 2,000 psf for support of the proposed residence. Footings should be a minimum width of 16 inches for continuous walls and 2 feet for columns. Loose and disturbed soils encountered at the foundation bearing level within the excavation should be removed and the footing bearing level extended down to the undisturbed natural soils. Exterior footings should be provided with adequate cover above their bearing elevations for frost protection. Placement of footings at least 36 inches below the exterior grade is typically used in this area. Continuous foundation walls should be reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 10 feet. Foundation walls acting as retaining structures should be designed to resist a lateral earth pressure based on an equivalent fluid unit weight of at least 45 pcf for the on -site soil as backfill. Floor Slabs: The natural on -site soils, exclusive of topsoil, are suitable to support lightly loaded slab -on -grade construction. To reduce the effects of some differential movement, floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4 inch layer of free - draining gravel should be placed beneath basement level slabs to facilitate drainage. This material should consist of minus 2 inch aggregate with less than 50% passing the No. 4 sieve and less than 2% passing the No. 200 sieve. All fill materials for support of floor slabs should be compacted to at least 95 % of maximum standard Proctor density at a moisture content near optimum. Required fill can consist of the on -site soils devoid of vegetation, topsoil and oversized rock. Underdrain System: Although free water was not encountered during our exploration, it has been our experience in mountainous areas that local perched groundwater can develop during times of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can create a perched condition. We recommend below -grade construction, such as retaining walls and basement areas, be protected from wetting and hydrostatic pressure buildup by an underdrain system. The drains should consist of drainpipe placed in the bottom of the wall backfill surrounded above the invert level with free - draining granular material. The drain should be placed at each level of excavation and at least 1 foot below lowest adjacent finish grade and sloped at a minimum 1% to a suitable gravity outlet. Free - draining granular material used in the underdrain system should contain less than 2% passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least 1' feet deep. H - GEOTECH Clint Sheridan August 4, 1997 Page 3 Surface Drainage: The following drainage precautions should be observed during construction and maintained at all times after the residence has been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95% of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 12 inches in the first 10 feet in unpaved areas and a minimum slope of 3 inches in the first 10 feet in pavement and walkway areas. A swale may be needed uphill to direct surface runoff around the structure. 4) Roof downspouts and drains should discharge well beyond the limits of all backfill. Percolation Testing: Percolation testing was performed on July 23, 1997 in holes which were prepared and pre - soaked by the owner. The test locations are shown on Fig. 1 and the results summarized on Table I. The percolation rates varied from 30 to 60 minutes per inch, possibly due to rock content of the soil. The tested area appears suitable for a conventional leach field septic system. sonneininatiagger inch can be used for design of the system. Limitations: This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either expressed or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory pits excavated at the locations indicated on Fig. 1 and to the depths shown on Fig. 2, the proposed type of construction, and our experience in the area. Our findings include interpolation and extrapolation of the subsurface conditions identified at the exploratory pits and variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified at once so re- evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recommendations, and to verify that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to the recommendations H -P GEOTECH Clint Sheridan August 4, 1997 Page 4 presented herein. We recommend on -site observation of excavations and foundation bearing strata and testing of structural fill by a representative of the geotechnical engineer. If you have any questions or if we may be of further assistance, please let us know. Sincerely, HEPWORTH - PAWLAK GEOTEC 4ICAL, INC. 6 Louis Eller ,, �REQ, '4 Reviewed By: r ` 0: ' ••• E • N • 'ri i i g o Ao 2 : • • •• 8 /51`77 le Daniel E. Hardin, P. o .• ••• 4e LEE /ro attachments H - GEOTECH APPROXIMATE SCALE 1' = 500' I I 1 I l i\- LOT 37 LOT BUILDING BOUNDARIES 7 SITE , P 2 A P 1 APPROXIMATE SCALE P 3 0 1' 30 A PIT 2 • PROPOSED RESIDENCE • PIT 1 • 197 434 HEPWORTH - PAWLAK I LOCATION OF EXPLORATORY PITS Fig. 1 GEOTECHNICAL, INC. AND PERCOLATION TEST HOLES PIT 1 PIT 2 to- ( K 7 � - 1 1 +4 =54 - u. 1 _ 1 — 200 =19 1 a — — $ ° 5 5 _° LEGEND: TOPSOIL; organic sandy silt, dry, dark brown. 7. ° 3 ' : GRAVEL (GM); sand and silt matrix, with cobbles and boulders up to 3 feet in diameter. ; • dense, molst, light brown, calcareous, basalt rock. r __ 1 __J Disturbed bulk sample. T Practical digging refusal with a backhoe. NOTES: 1. Exploratory pits were excavated prior to our arrival at the site on July 23. 1997. 2. Locations of exploratory pits were measured approximately by pacing from features on the site plan provided. 3. Elevations of exploratory pits were not measured and logs of exploratory pits are drawn to depth. 4. The exploratory pit locations should be considered accurate only to the degree implied by the method used. 5. The lines between materials shown on the exploratory pit logs represent the approximate boundaries between material types and transitions may be gradual. 6. No free water was encountered in the pits at the time of excavating. Fluctuations in water level may occur with time. 7. Laboratory Testing Results: +4 = Percent retained on No. 4 sieve —200 = Percent passing No. 200 sieve 197 434 HEPWORTH — PAWLAK I LOGS OF EXPLORATORY PITS Fig. 2 GEOTECHNICAL, INC. i KIOROMEet1 MALL= i WYE WOES M t MIL $TAIDMIL ®EI 1 DIM wwUME COSMOS b MIL 1 W. 80 ate ILL 4 W. .t el. POO 1100 PO PO 815 A 3/rtiewe - - _ — . rr r 0 too — C - -. cal O ---- -L alas — al -- --- — a 10 ImiN■ mama am an ammaama a was C - - - -. — — — — awm alinalimilea L— — Ian a — -- - Mia Mena — m —. — ma — _ isa son — — - -- — — -- ma namil ma miala - _ - -�— — fU Hanna - —C. Mina saga — a RX: amaanso an —.— — swam 8 as nooses anaa allanom as __ V, .— - -- -- — 40 z Z b — - -_ rn- 6 — a... — — a. W Nasals a. — _ m _ � a01 — W m —. — ' uss — U W r- -- - - -- � C CL �— — b 40 — _—. . ana ......... — a a la ma _ X= �p�C - - — — — — — ma amailla — .—ligal— —aill• ma imam — C -- - -- — a �� -- ----- —. Ea Ea m m — — a am an as .— aaandm — - -- — — -- manna — — aellaaa — — - - - —� NaMn — IC - — — — ism mina a a la tap ans. a ° a pp .I 1.15 2.38 4.75 0.6 tap 37.5 712 152 m7 ,ppt .opt .apt apO am .orr .074 .tm tO.6 127 DIAMETER OF PARTICLES IN MILLIMETERS CLAY TO dr yi w 1 COWL° ntE �MM1 �aDMlE 1 FYE COME • GRAVEL 54 R SAND 27 X SILT AND CLAY 19 X LIQUID IJMIT X PLASTICITY INDEX R SAMPLE OF: Silty Sandy Gravel with Cobbles FROM: Pit 2 at 1 thru 3 Feet 197 434 HEPWORTH — PAWLAK 1 GRADATION TEST RESULTS Fig. 3 GEOTECHNICAL, INC. , HEPWORTH- PAWLAK GEOTECHNICAL, INC. TABLE I PERCOLATION TEST RESULTS JOB NO. 197 434 HOLE NO. HOLE DEPTH LENGTH OF WATER DEPTH WATER DEPTH DROP IN AVERAGE (INCHES) INTERVAL AT START OF AT END OF WATER PERCOLATION (MIN) INTERVAL INTERVAL LEVEL RATE (INCHES) (INCHES) (INCHES) (MIN. /INCH) P -1 48 15 8 7 1 water added 9 8 1 water added 9 81/4 % 8'/. 7 % % water added 9 8,% ,% 8'% 8 1 8'% 8 '/ 30 P -2 46 15 6 5 'A '4 water added 6'% 6 '% water added 7% 7% %. 7'6 71/4 '/4 7'h 7 % 7 6% % 60 P -3 42 15 6 5 1 water added 7 6'% % 6'% 6 % water added 8 7% f 7% 7 / 7 6% '6 i