HomeMy WebLinkAbout03340 TYPE OF INDIVIDUAL SEWAGE DISPOSAL SYSTEM PROPOSED:
(74 SEPTIC TANK ( ) AE1tATION PLANT ( ) VAULT
( ) VAULT PRIVY ( ) COMPOSTING TOILET ( ) RECYCLING, POTABLE USE
( ) PIT PRIVY ( ) INCINERATION TOILET ( ) RECYCLING, OTHER USE
( ) CHEMICAL TOILET ( ) OTHER - DESCRIBE
FINAL DISPOSAL BY:
p4 ABSORPTION TRENCH, BED OR PIT ( ) EVAPOTRANSPIRATION
( ) UNDERGROUND DISPERSAL ( ) SAND FILTER
( ) ABOVE GROUND DISPERSAL ( ) WASTEWATER POND
( ) OTHER - DESCRIBE
WILL EFFLUENT BE DISCHARGED DIRECTLY INTO WATERS OF THE STATE? ALD
PERCOLATION TEST RESULTS: (To be completed by Registefed Professional Engineer, if the Engineer does the
Percolation Test) AV M' • sr: � l t-` i NSS t r.,o W
Minutes j0 per inch in hole No. 1 Minutes 4d per inch in hole NO. 3
Minutes Z 4 per inch in hole No. 2 Minutes per inch in hole NO. _
Name, address and telephone of RPE who made soil absorption tests: tk P GAO - _c-rt
Name, address and telephone of RPE responsible for design of the system: ti 1> Ciro- 1 tc-Gt
sio o.1z.. ( C4- - G.S.Go. glbOl °t 798
Applicant acknowledges that the completeness of the application is conditional upon such further mandatory and
additional tests and reports as may be required by the local health department to be made and furnished by the applicant
or by the local health department for purposed of the evaluation of the application; and the issuance of the permit is
subject to such terms and conditions as deemed necessary to insure compliance with rules and regulations made,
information and reports submitted herewith and required to be submitted by the applicant are or will be represented to
be true and correct to the best of my knowledge and belief and are designed to be relied on by the local department of
health in evaluating the same for purposes of issuing the permit applied for herein. I further understand that any
falsification or misrepresentation may result in the denial of the application or revocation of any permit granted based
upon said appF' ;.In. \in legal action for perjury as provided by law.
Signed 't' a le Date 5 - 7- 6 - el
PLEASE DRAW AN ACCURATE MAP TO YOUR PROPERTY!!
3
•
Michael and Barbara Larime
October 8,1999
Page 2
Subsurface Conditions: The subsurface conditions at the site were evaluated by
excavating two exploratory pits in the building area and one profile pit in the septic
disposal area at the approximate locations shown on Fig. 1. The Togs of the pits are
presented on Fig. 2. The subsoils encountered, below about 1 foot of topsoil, consist of
stiff sandy clay and silt. Siltstone bedrock was encountered at a depth of 71/2 feet in Pit
1. Results of swell- consolidation testing performed on relatively undisturbed samples of
the clay, presented on Fig. 3, indicate low to moderate compressibility under conditions
of loading and wetting. One sample showed a minor collapse potential (settlement under
constant load) when wetted. The laboratory testing is summarized on Table I. Free
water was observed at a depth of 9' feet in Pit 2 and in the Profile Pit at the time of
excavation. The soils were slightly moist to moist.
Foundation Recommendations: Considering the subsoil conditions encountered in the
exploratory pits and the nature of the proposed construction, we recommend spread
footings placed on the undisturbed natural soil designed for an allowable soil bearing
pressure of 2,000 psf for support of the proposed residence. The soils tend to compress
after wetting and there could be some post- construction foundation settlement,
especially where footings transition the soil and bedrock. Footings should be a
minimum width of 16 inches for continuous walls and 2 feet for columns. Loose and
disturbed soils encountered at the foundation bearing level within the excavation should
be removed and the footing bearing level extended down to the undisturbed natural
soils. Exterior footings should be provided with adequate cover above their bearing
elevations for frost protection. Placement of footings at least 36 inches below the
exterior grade is typically used in this area. Continuous foundation walls should be
reinforced top and bottom to span local anomalies such as by assuming an unsupported
length of at least 12 feet. Additional reinforcement may be desirable across the soil -
bedrock bearing and at steps in grade. Foundation walls acting as retaining structures
should be designed to resist a lateral earth pressure based on an equivalent fluid unit
weight of at least 50 pcf for the on -site soil as backfill.
Floor Slabs: The natural on -site soils, exclusive of topsoil, are suitable to support
lightly loaded slab -on -grade construction. To reduce the effects of some differential
movement, floor slabs should be separated from all bearing walls and columns with
expansion joints which allow unrestrained vertical movement. Floor slab control joints
should be used to reduce damage due to shrinkage cracking. The requirements for joint
H -P GEOTECH
Michael and Barbara Larime
October 8,1999
Page 4
Proctor density in landscape areas. Free - draining wall backfill should be
capped with about 2 feet of the on -site, finer graded soils to reduce
surface water infiltration.
3) The ground surface surrounding the exterior of the building should be
sloped to drain away from the foundation in all directions. We
recommend a minimum slope of 12 inches in the first 10 feet in unpaved
areas and a minimum slope of 3 inches in the first 10 feet in pavement
and walkway areas. A swale will be needed uphill to direct surface
runoff around the residence.
4) Roof downspouts and drains should discharge well beyond the limits of
all backfill.
Percolation Testing: Percolation tests were conducted on September 29, 1999 to
evaluate the feasibility of an infiltration septic disposal system at the site. One profile
pit and three percolation holes were dug at the locations shown on Fig. I. The test
holes (nominal 12 inch diameter by 12 inch deep) were hand dug at the bottom of
shallow backhoe pits and were soaked with water one day prior to testing. The soils
exposed in the percolation holes are similar to those exposed in the Profile Pit shown on
Fig. 2 and consist of about 1 foot of topsoil overlying stiff sandy clay and silt. The
percolation test results are presented in Table II. The percolation test results indicate an
infiltration rate between 24 and 40 minutes per inch with an average of 31 minutes per
inch. Based on the subsurface conditions encountered and the percolation test results,
the tested area should be suitable for a conventional infiltration septic disposal system.
The system may need to be mounded above the groundwater condition.
Limitations: This study has been conducted in accordance with generally accepted
geotechnical engineering principles and practices in this area at this time. We make no
warranty either expressed or implied. The conclusions and recommendations submitted
in this report are based upon the data obtained from the exploratory pits excavated at the
locations indicated on Fig. 1, the proposed type of construction and our experience in
the area. Our findings include interpolation and extrapolation of the subsurface
conditions identified at the exploratory pits and variations in the subsurface conditions
may not become evident until excavation is performed. If conditions encountered
during construction appear different from those described in this report, we should be
notified at once so re- evaluation of the recommendations may be made.
H -P GEOTECH
col
k • ` \ \
\ • ) >- #
7
) 2
d / )2|
•
§
¥
o . _
¢ § /�
Q 2 °
0 } °` -
q \\
_<
▪ 1- S §§
ant E \ � » ® "
e o
\ \ c
2 Q w
i ° \
_
i° CO
2 } \
0 0
&
, � = f
0
\A —
HEPWORTH- PAWLAK GEOTECHNICAL, INC.
TABLE II
PERCOLATION TEST RESULTS JOB NO. 199 692
HOLE NO. HOLE DEPTH LENGTH OF WATER DEPTH WATER DEPTH DROP IN AVERAGE
(INCHES) INTERVAL AT START OF AT END OF WATER PERCOLATION
(MIN) INTERVAL INTERVAL LEVEL RATE
(INCHES) (INCHES) (INCHES) (MIN. /INCH)
P -1 43 15 8 3/4 8 1/4. 1/2
8 1/4 7 3/4 1/2
7 3/4 7 1/4 1/2
7 1/4 6 3/4 1/2.
6 3/4 6 1/4 1/2
6 1/4 6 1/4
6 5 1/2 1/2
51/2 5 1/2 3 Q
P-2 51 15 9 7 1/2 1 1/2
7 1/2 6 1/2 1
6 1/2 5 1/2 1
5 1/2 4 1/2 1
4 1/2 3 3/4 3/4
3 3/4 3 1/4 1/2 24
P-3 44 15 9 8 1/2 1/2
8 1/2 8 1/4 1/4
8 1/4 7 3/4 1/2
7 3/4 7 1/2 1/4
7 1/2 7 1/2
7 6 3/4 1/4
6 3/4 6 1/4 1/2
61/4 6 1/4 40
NOTE: Percolation test holes were hand dug in the bottom of backhoe pits and soaked on September 28, 1999.
Percolation tests were conducted on September 29, 1999. The average percolation rate was based on the last two
readings of each test.