HomeMy WebLinkAbout5772 1. Is a site plan included that indicates the distance of the proposed
building or addition to property lines, other buildings, set back
easements and utility easements?
Yes ✓ No 0) Not necessary for this project (2)
•
2. Does the site plan include the location of the I.S.D.S. (Individual
Sewage Disposal System) and the distances to property lines, wells (on
subject property and adjacent properties) , streams or water courses?
Yes ✓ No (u Not necessary for this project (2)
3. Does the site plan indicate the location and direction of the County or
private road accessing the property?
Yes ✓ No n; Not necessary for this project (2)
4. Do the plans include a foundation plan indicating the size, location
and spacing of all reinforcing steel in accordance with the uniform
building code or per stamped engineered design?
Yes ✓ No (1) Not necessary for this project (2)
•
S. Do the plans indicate the location and size of ventilation openings for
under floor crawl spaces and the clearances required between wood
and earth?
Yes No ()) Not necessary for this project %< (2)
6. Do the plans indicate the size an location of ventilation openings for .
the attic, roof joist spaces and soffits?
Yes V No (() Not necessary for this project (2)
7. Do the plans include design loads as required under the Uniform
R,t Building code for roof snow loads, (a minimum of 40 pounds per
• I\
square foot in Garfield County) floor loads and wind loads?
Yes v No (o Not necessary for this project (2)
8. Does the plan include a building section drawing indicating
foundation, wall, floor and roof construction?
Yes No (,) Not necessary for this project (2)
9. Does the building section drawing include size and spacing of floor
joists, wall studs, ceiling joists, roof rafters or joists or trusses?
Yes No (n Not necessary for this project (2)
2
•
•
10. Does the building section drawing or other detail include the method
of positive connection of all columns and beams?
Yes / No (U Not necessary for this project (2)
11. Does the plan indicate the height of the building or proposed addition
from the highest point of the building or addition measured at mid
span between the ridge and the eave down to existing grade contours?
Yes ✓ No (1) Not necessary for this project (2)
12. Does the plan include any stove or zero clearance fireplace planned
for installation including make and model and Colorado Phase II
certifications or phase II EPA certification?
Yes No (u Not necessary for this project ¥ (2)
13. Does the plan include a masonry fireplace including a fireplace
section indicating design to comply with the Uniform Building Code
Chapter 37?
Yes No u, Not necessary for this project _1S__(2)
14. Does the plan include a window schedule or other verification that
egress /rescue windows from sleeping rooms and /or basements
comply with the requirements of the Uniform Building Code?
Yes z No (i) Not necessary for this project (2)
15. Does the plan include a window schedule or other verification that
windows provide natural Light and ventilation for all habitable rooms?
Yes ✓ No (n Not necessary for this project (2)
16. Do the plans indicate the location of glazing subject to human impact
such as glass doors, glazing immediately adjacent to such doors;
.glazing adjacent to any surface normally used as a walking surface;
sliding glass doors; fixed glass panels; shower doors and tub
enclosures and specify safety glazing for these areas?
Yes / No (u Not necessary for this project (2)
X 17. Is the location of all natural and liquid petroleum gas furnace; boilers
and water heaters indicated on the plan? —�
Yes No (I) Not necessary for this project (2)
18 Do you understand that if you belong to a homeowners association, it
is your responsibility to obtain written permission from that
association, if required by that association, prior to submitting an
application for a building permit? Si, es No (1) Not necessary for this project ' '(2)
3
19. Have two (2) complete sets of constructions drawings been submitted
with the application? •
Yes ✓✓ No II) Not necessary for this project (2)
20. Is this an application for the placement of a manufactured home?
Yes No
• If yes, have you specified the size of the unit (min. 20ft x 20ft); live
roof load (min.40 #); wind design (min. wind speed of 80 mph & 15 lb.
wind load); foundation design; method of anchoring?
Yes No • (1) Not necessary for this project (2)
21. Have you designed or had this plan designed while considering
building and other construction code requirements?
Yes No (3)
22. Does the plan accurately indicate what you intend to construct and
what will receive a final inspection by the Garfield Building
Department?
Yes 5eN No (3)
23. Do you understand that approval for design and /or construction
changes are required prior to the application of these changes?
• Yes K No (3)
24. Do you understand that the Building Department will collect a "Plan
Review" fee from you at the time of application and that you will be
required to pay the "Permit Fee" as well as any "School impact" or
"Septic system " fees required, at the time you pick up your building
• permit?
Yes ? No (3)
25. Are you aware that you are required to call for all inspections required •
under the Uniform Building Code including approval on a final
inspection prior to receiving a Certificate of Occupancy and
occupancy of the building?
Yes _ No (3)
26. Are you aware that the person signing the Permit Application whether
the "Owner "; "Agent of the Owner ", "General Contractor ", "Contractor"
or otherwise, signing the application is the party responsible for the
project complying with the Uniform Codes ".
Yes L No (3)
(CONTINUED ON NEXT PAGE)
4
I hereby acknowledge that [ have read, understand and answered these
questions accurately to the best of my ability.
signature • date
Phone: (days); _ (evenings)
Project Name:
Project Address:
Notes:
(1) If you have answered No on any of these questions you may be required to provide this information at
the request of the Building Official prior to beginning the plan review process. Delays in issuing the
permit are to he expected. Work may not proceed without the issuance of the permit.
(2) If you have answered 'Not necessary for this project on any of the questions and it is determined by the
Building Official that the information is necessary 10 review the application and plans to deterrnine
minimum compliance with the adopted codes, please expect the following:
•
A. The application may he placed behind more recent applications for building permits in the review
process and not reviewed until required information has been provided and the application
rotates again to first position for review.
B. Delay in Issuance of the permit.
C. Delay in proceeding with construction.
(3) If you answered No to this question the circumstances described in the question could result in a "Stop
Work Order" being issued or a "Certificate of Occupancy' not being Issued
PerApp02.95 Effective August 15, 1995
•
•