Loading...
HomeMy WebLinkAbout1.06 Landscape plan narrative.pdfMiddle Fork Water Recycling Facility Expansion Landscape Plan Landscape Plan TABLE OF CONTENTS 1.0 Introduction 1 2.0 Required Exhibits 1 3.0 Estimated Cost 1 4.0 Landscape Maintenance 1 Middle Fork Water Recycling Facility Expansion Landscape Plan 1.0 INTRODUCTION The following section addresses the requirements for the Landscape Plan under Section 4 -502 of the Garfield County Unified Land Use Resolution of 2008. 2.0 REQUIRED EXHIBITS The illustration of the topographic information of the site, location of lot lines and the identification of all existing deciduous tree and coniferous trees of six inches (6 ") in caliper or greater is provided in the Proposed Stormwater and Erosion Control Plan located in the Maps and Plans Tab. 3.0 ESTIMATED COST This site is a previously disturbed area and there will not be additional incurred costs for landscaping as a result of this project. 4.0 LANDSCAPE MAINTENANCE Encana utilizes interim reclamation and final stabilization practices outlined in the SWMP to maintain landscaping in and around the MFWRF. A copy of the SWMP can be found in the Maps and Plans Tab. Encana will also follow recommendations made in the North Parachute Ranch Reclamation Plan, also located in the Impact Analysis Tab. The project site is located in the Lower Zone Bench areas and Encana will adhere to the suggestions where applicable. Middle Fork Water Recycling Facility Expansion 1